You will be working at a specialized construction company in Zeeland that focuses on the production of steel foundation piles and sheet pile structures for the construction, civil engineering, and hydraulic engineering sectors. The company has been active since 1990 and has developed into a leading player in the field of pipe piles and combi piles.
The workshop covers more than 1,200 m2 and is equipped with modern machines for cutting, welding, and construction work. Heavy steel pipes up to 35 meters in length are used - not a standard production environment, but an environment for professionals who love big and tough work.
It is a stable company with a loyal team where quality, safety, and craftsmanship are central.